Caption: Date: 1970-12 Location: Rawutkot, Dailekh Description: Digging of the pit into which the southern concrete anchor of the Chamghat River suspension bridge was to be constructed. Planned dimensions were 4’ wide by 5’ long by 4’ deep and was to be constructed of river stones and concrete. Keywords: Alan Fairbank, Nepal Photo History Project, Peace Corp Photo History, bridge building, handicrafts